Industry Reports

Brazilian Disturbance 2/3/2016

At 08:15 am the 500 kV line #3 between TucuruĂ­ and Vila do Conde was correctly tripped by Main 1 and 2 protections because of a single phase to ground short circuit at TucuruĂ­, as a consequence of a CT failure followed by its explosion and fire. More

Relion advanced protection & control.
BeijingSifang June 2016