Pilot Protection System Failure - an Investigation

Protection system failures are sometimes hard to detect, especially in the case of electromechanical relays with no inherent self-testing or alarming. It often takes a misoperation of the protection system and the following investigation to discover the problem. At this point it is too late and the damage is already done. This paper examines an event on the Oncor Electric Delivery system in which a critical customer, normally served by four 138kV transmission lines, was left hanging on a single feed due to a fault and two relaying system failures. Subsequent investigation revealed that both relaying system failures had been present for extended periods of time. Recommendations for future changes are presented. More

Ad: ABB is a proud supplier for the TVA Bradley Substation Project. Selected for the Bradley project, ABB 670 series family of relays and controllers is one of the first to prove the multi-vender interoperability of IEC 61850 on a commercial scale.
Ad: NovaTech - Multiple functions, minimal headaches.
Ad: CAMILLE BAUER - SINEAX CAM: The measurement and gateway solution for IEC 61850